RetroFed Forum
Your home away from modern life.
Amazon villages build autonomous energy systems after mega-dam failed pledges
Post Reply
AuthorMessage
Jim East slrpnk.net wolfyvegan@slrpnk.net
Joined: 2025-03-28
Quote

  • A pilot project in the Tapajós-Arapiuns Reserve is providing 24-hour electricity through an integrated system of solar panels and river-based hydrokinetic turbines.
  • The project’s hydrokinetic turbines use specialized filter systems and slow-rotation grids designed to generate electricity without harming local river fauna.
  • Roughly 990,000 people in the Brazilian Amazon still lack access to electricity despite the region hosting some of the world’s largest hydropower facilities.
3   Original
Post Reply
Back to top