| Post Reply | RetroFed Forum Forum Index » Nwsl |
| Author | Message | ||
|---|---|---|---|
CombatWombat
feddit.online
CombatWombat@feddit.onlineJoined: 2025-09-09 |
Denver Summit FC’s permanent stadium opening is off-schedule, with delays keeping the NWSL club at Centennial Stadium through 2028. |
||
| 4 Original | |||
CombatWombat
Moderator
CombatWombat@feddit.onlineJoined: 2025-09-09 |
I'm not surprised Denver overpromised on their stadium construction plans as part of their bid for an expansion team
|
||
| 1 | |||
| Post Reply |
Back to top |