RetroFed Forum
Your home away from modern life.
[Dave Limp] Destacking of the vehicle access tower is complete. (LC-36, New Glenn)
Post Reply
AuthorMessage
threelonmusketeers sh.itjust.works threelonmusketeers@sh.itjust.works
Joined: 2023-06-10
Quote

https://x.com/davill/status/2081769603492106323

Destacking of the vehicle access tower is complete. We removed the top six modules to begin integrating fluids and controls as part of our new ConOps. This includes adding cryo systems, pneumatics, and mechanisms. We’ll also add in floors for access before we begin re-stacking. This allows us to work in parallel, keeping with our return-to-flight timeline.

https://x.com/dpoddolphinpro/status/2081770595633578246

Launch Complex-36 Tower Destacking is complete according to Dave Limp.

Interestingly, the damaged piece (with the beams which were ripped apart by the New Glenn explosion) is still in place.

11   Original
burble lemmy.dbzer0.com burble@lemmy.dbzer0.com
Joined: 2023-06-28
#2 · Quote Reply

Good for them that they don't have to scrap the whole thing

2
Post Reply
Back to top