| Post Reply | RetroFed Forum Forum Index » Hydrogen |
| Author | Message | ||
|---|---|---|---|
Hypx
piefed.social
Hypx@piefed.socialJoined: 2025-09-26 |
Almost 6 GW of entry and exit capacity had been reserved on a paid basis across Germany's planned hydrogen core network as of July 23, 2026, doubling the level reported in May. |
||
| 4 Original | |||
| Post Reply |
Back to top |