Pairs well with that report about Amazon having billions of dollars worth of GPUs in storage because they don’t have DCs to put them in. At least these come pre-packaged in a container you can just park somewhere!
That’s the equivalent daily water use of 375,000 people (UK figures). Obvious next question is “yes but how much water are you still using after that?” |
||
| 11 | |||
|
Soyweiser
awful.systems
Soyweiser@awful.systems Joined: 2023-09-07 |
Nvidia claims deployment could shrink from six months to as little as 14 days at a prepared site. That excludes the not insignificant matter of getting power, connectivity, and other site infrastructure ready first. Pairs well with that report about Amazon having billions of dollars worth of GPUs in storage because they don’t have DCs to put them in. At least these come pre-packaged in a contai...
So the datacenters do use a massive amount of water. |
||
| 7 | |||
|
rhamph
awful.systems
rhamph@awful.systems Joined: 2026-08-24 |
“At 2 gigawatts, DSX can save 54 million litres of water a day,” So the datacenters do use a massive amount of water.
Just as AI and quantum computing that doesn’t suck is always just a little bit off in the future, data centres that churn through horrendous amounts of water are always a thing of the recent past. |
||
| 8 | |||
|
BurgersMcSlopshot
awful.systems
BurgersMcSlopshot@awful.systems Joined: 2024-01-15 |
Expected more ducks. Level of ducks was disappointing, and the ducks that were there were creepy. |
||
| 3 | |||
|
YourNetworkIsHaunted
awful.systems
YourNetworkIsHaunted@awful.systems Joined: 2024-03-22 |
Nvidia claims deployment could shrink from six months to as little as 14 days at a prepared site. That excludes the not insignificant matter of getting power, connectivity, and other site infrastructure ready first. Pairs well with that report about Amazon having billions of dollars worth of GPUs in storage because they don’t have DCs to put them in. At least these come pre-packaged in a contai...
So wait, if you recategorize all the hardest parts as "preparing the site" then the project speeds up significantly? |
||
| 4 | |||
o7___o7
awful.systems
o7___o7@awful.systemsJoined: 2023-10-08 |
So wait, if you recategorize all the hardest parts as "preparing the site" then the project speeds up significantly?