RetroFed Forum
Your home away from modern life.
'Stench Creek' signs raise eyebrows in Parksville Qualicum Beach
Post Reply
AuthorMessage
LimpRimble lemmy.ca LimpRimble@lemmy.ca
Joined: 2024-02-13
Quote

The odour control upgrades, part of the French Creek Pollution Control Centre: Expansion and Odour Control Upgrades project, will begin in 2026 and be operational in spring 2027

1   Original
Post Reply
Back to top