RetroFed Forum
Your home away from modern life.
AI data centre going into shuttered protein plant just outside Winnipeg
Post Reply
AuthorMessage
ValueSubtracted startrek.website ValueSubtracted@startrek.website
Joined: 2023-06-11
Quote

18   Original
a_gee_dizzle lemmy.ca a_gee_dizzle@lemmy.ca
Joined: 2025-10-27
#2 · Quote Reply

Will this have any effect on hydro costs?

3
ValueSubtracted Moderator ValueSubtracted@startrek.website
Joined: 2023-06-11
#3 · Quote Reply

Will this have any effect on hydro costs?

Probably not, if their estimate of 5.5 MW is accurate - less than a thousandth of the MB Hydro capacity.

2
a_gee_dizzle lemmy.ca a_gee_dizzle@lemmy.ca
Joined: 2025-10-27
#4 · Quote Reply

Probably not, if their estimate of 5.5 MW is accurate - less than a thousandth of the MB Hydro capacity.

Okay well that's good to know at least

2
kent_eh lemmy.ca kent_eh@lemmy.ca
Joined: 2023-06-06
#5 · (edited) Quote Reply

Will this have any effect on hydro costs?

And how much drinkable water will they be wastin to keep the thing cool?

1
Post Reply
Back to top